One scope, from the interconnection to the compute hall.

One contract. One schedule. One party accountable for the interfaces. Dojinn carries the interconnection from the utility or an IPP through the hall, on five continents.

Substation, distribution, civil, and the hall sit in that scope. Subcontractors work under the same contract. Power and cooling are N+1 or better, one spare beyond what is running. 2N, a second full path, is available where you require it.

  1. 01 · Site & civil

    Pad, roads, drainage, foundations, duct banks.

  2. 02 · Power

    Interconnection and substation.

  3. 03 · Electrical

    480V AC distribution to the hall. 800V DC for the newest high-density racks, on the OCP and NVIDIA path.

  4. 04 · Cooling

    Closed loop. Direct-to-chip liquid.

  5. 05 · Compute

    Rack power and liquid for your IT, from 50 kW to a few hundred kW.

  6. 06 · The hall

    Envelope and fit-out, commissioned to handover.

How We Work