Power, from the interconnection to the rack.
An IPP or a third party supplies on-site generation. Dojinn’s scope is the interconnection, the substation, distribution, and the hall. N+1 or better on power and cooling, one spare beyond what is running. 2N where you require it, a second full path. One feeder is shown.
Feeder closed
-
01
Generation by others
An IPP or a third party supplies generation. Dojinn integrates to it.
-
02
Storage
Batteries cover ramps and short gaps. Firm capacity behind them is IPP or third-party generation and the grid.
Dojinn’s work starts at the interconnection.
The drawing shows that interface.