Power, from the interconnection to the rack.

An IPP or a third party supplies on-site generation. Dojinn’s scope is the interconnection, the substation, distribution, and the hall. N+1 or better on power and cooling, one spare beyond what is running. 2N where you require it, a second full path. One feeder is shown.

M Meter Utility or IPP BESS Generation (by others) Feeder Hall

Feeder closed

  1. 01

    Generation by others

    An IPP or a third party supplies generation. Dojinn integrates to it.

  2. 02

    Storage

    Batteries cover ramps and short gaps. Firm capacity behind them is IPP or third-party generation and the grid.

Dojinn’s work starts at the interconnection.

The drawing shows that interface.

Sustainability